VALENCIA PROJECT
 
 
 

 

DRILLING / COLLAR LOCATIONS
 

FORSYS CONFIRMS DEEPER URANIUM MINERALIZATION AT VALENCIA   (Details HERE)


July 17 Selected holes

Table 1: Southwest Zone Highlights

Hole

From
(m)

To
(m)

Interval
(m)

Grade
(Kg/T eU3O8)*

PD-021

168.90

286.40

117.50

0.255

Including

190.10

282.20

92.10

0.293

 

308.30

345.80

37.50

0.216

Including

316.80

344.70

27.90

0.248

PD-027

274.70

295.30

20.60

0.178

Including

274.70

292.90

18.20

0.193

 

297.40

336.80

39.40

0.157

Including

298.50

314.90

16.40

0.220

PD-028

280.70

350.00

69.30

0.132

Including

320.90

349.40

28.50

0.157

Hole

 

From
(m)

To
(m)

 

Interval
(m)

 

Grade
(Kg/T eU3O8)*

PD-029

159.70

178.10

18.40

0.151

 

199.30

237.10

37.80

0.191

Including

216.10

236.90

20.80

0.231

 

253.10

297.50

44.40

0.152

Including

269.60

282.80

13.20

0.262

 

300.20

358.10

57.90

0.170

Including

300.50

307.20

6.70

0.231

Including

343.90

356.60

12.70

0.238

PD-030

141.90

300.50

158.60

0.199

Including

198.20

236.90

38.70

0.215

Including

264.90

275.50

10.60

0.198

Including

276.60

300.10

23.50

0.248

 

302.40

337.20

34.80

0.147

Including

306.70

309.10

2.40

0.188

Including

316.30

321.70

5.40

0.358

PD-032

141.70

191.40

49.70

0.153

Including

145.90

150.20

4.30

0.179

Including

152.30

157.00

4.70

0.166

Including

181.00

190.40

9.40

0.287

 

307.30

338.30

31.00

0.177

Including

307.30

310.70

3.40

0.266

Including

313.90

319.10

5.20

0.207

Including

323.00

334.40

11.40

0.223

PD-034

169.90

190.40

20.50

0.190

Including

170.30

183.70

13.40

0.229

 

213.40

350.00

136.60

0.197

Including

200.30

210.40

10.10

0.246

Including

220.30

227.60

7.30

0.480

Including

229.20

233.10

3.90

0.448

 

240.40

277.50

37.10

0.211

Including

283.30

290.20

6.90

0.430

 

314.00

334.40

20.40

0.202

Including

314.00

322.20

8.20

0.315

 

336.00

350.00

14.00

0.180

PD-036

51.30

55.70

4.40

0.131

 

149.10

156.80

7.70

0.175

 

193.90

243.90

50.00

0.116

Including

232.40

243.50

11.10

0.162

PD-037

28.50

70.50

42.00

0.244

Including

40.70

53.80

13.10

0.322

Including

54.40

60.40

6.00

0.285

Including

61.50

67.90

6.40

0.355

 

181.00

309.00

128.00

0.214

Including

185.70

203.40

17.70

0.274

Including

224.80

250.30

25.50

0.268

Including

252.10

259.00

6.90

0.280

 

309.90

354.10

44.20

0.141

 

Hole

From
(m)

 

To
(m)

 

Interval
(m)

 

Grade
(Kg/T eU3O8)*

PD-038

23.50

60.00

36.50

0.277

Including

34.00

45.00

11.00

0.346

Including

54.50

59.90

5.40

0.363

 

156.10

173.90

17.80

0.223

Including

156.10

157.50

1.40

0.377

Including

165.90

173.90

8.00

0.317

 

199.70

210.80

11.10

0.245

Including

201.20

208.30

7.10

0.329

 

228.00

259.60

31.60

0.230

Including

228.30

237.20

8.90

0.285

Including

247.80

257.80

10.00